CIS2 and user provisioning ADT events over HL7 FHIR resource profiles PDF assessment summaries to your EPR Agreed with your teams

Integration

How we integrate with your Trust

A practical, flexible integration approach

We understand that NHS Trusts have different EPR platforms, integration engines, security requirements and approval processes. Our integration capabilities provide a standard starting point, but we agree the specific implementation with your technical and clinical teams.

1

STEP 01

Discovery and requirements

We meet with your integration and digital teams to understand your existing environment. This includes identifying:

  • Your PAS, EPR and integration-engine products.
  • The Melo integration capabilities you wish to enable.
  • Supported standards and interface specifications.
  • Patient identifier and location-mapping requirements.
  • Authentication, network and security requirements.
  • Clinical workflows and operational responsibilities.
OutcomeAn agreed integration scope and proposed technical approach.
2

STEP 02

Integration design

We document the agreed data flows and interface configuration. Depending on the integration, this may include:

  • CIS2 authentication and user-provisioning arrangements.
  • ADT event types, HL7 mappings and patient-matching rules.
  • FHIR resource profiles, document metadata and EPR endpoint requirements.
  • Authentication and connectivity arrangements.
  • Error handling, monitoring and reconciliation responsibilities.
OutcomeAn integration design agreed with the Trust’s technical team.
3

STEP 03

Configuration and connectivity

Our team configures Melo’s integration interfaces and works with the Trust to establish secure connectivity.

Where appropriate, we use the Trust’s existing integration engine or interoperability platform to minimise changes to established infrastructure.

OutcomeSecure integration connections available for testing.
4

STEP 04

Testing and validation

We carry out integration testing with the Trust before production use. Testing typically covers:

  • Successful and unsuccessful user authentication.
  • Patient admission, transfer and discharge events.
  • Patient identifier matching and exception handling.
  • PDF assessment-summary delivery.
  • Unavailable endpoints, failed messages and recovery.
  • Relevant security, audit and clinical workflow scenarios.
OutcomeAgreed test results and readiness for production deployment.
5

STEP 05

Go-live and ongoing support

Once testing and local approvals are complete, the integrations can be enabled in production. We agree any required cutover arrangements, operational monitoring, incident contacts and support processes.

Melo provides ongoing application support, including investigation of integration issues and coordination with your Trust’s technical team.

OutcomeOperational integrations supported by an agreed service process.

06

Typical integration areas

A flexible, Trust-specific integration

  • Works with your existing EPR, PAS and integration engine.
  • Adapts to your security, network and approval requirements.
  • Agreed in detail with your technical and clinical teams.
AuthenticationCIS2 and user provisioning
ADT eventsAdmissions, transfers and discharges (HL7)
FHIRResource profiles, documents and EPR endpoints
PDF deliveryAssessment summary to your EPR

Standards & interoperability

CIS2HL7 (ADT)FHIR

07

Download the PDF

The same five steps as this page on a single page, to print, forward or share with your integration team. Fill in the form for an instant download link, with a copy sent to your inbox.

Preview of the Melo integration one-pager
What’s inside
  • The five integration steps
  • The outcome of each step
  • Typical integration areas
  • Standards and interoperability

One page, written for NHS Trust integration, digital and IT teams.

Talk to us about your integration

Tell us about your EPR, PAS and integration engine, and we’ll talk it through with your team.